How to Remodel Your Kitchen Without Regret: New Kitchen Remodeling Book

Every kitchen remodel starts with a daydream. You imagine sliding open deep drawers instead of fighting a jumble of pans, pulling espresso shots at a tidy coffee station, and hosting friends without tripping over trash bins. Then reality throws elbows. Cabinets are backordered, the electrician wants to open a wall you thought was sacred, and the bid you loved morphs into something with more change orders than meals you’ll cook this month. I’ve been on both sides of that story, as a homeowner and as a remodeler guiding clients through messy, high-stakes decisions. You can get a beautiful kitchen without losing sleep or blowing your budget, but it takes a clear plan and the right playbook.

image

That’s why I’m excited about the new home remodeling book launch of Remodel Without Regret: Surprise Costs, Contractor Ghosting, and Delays. It does what most glossy design books avoid. It explains the unglamorous parts that make or break a project: scoping, estimating, vetting contractors, contingency planning, and sequencing. Whether you’re tackling a kitchen, a bath, or a whole-house update, the mindset and methods carry over. Below, I’ll share the techniques I teach clients and highlight where this new home renovation book lines up with hard-earned reality.

Start with constraints, not cabinets

When people say they want a “timeless” kitchen, they usually mean they don’t want to hate it in five years. Longevity starts with constraints. Measure your space twice and then again after you sleep on it. Note window placements, plumbing stacks, load-bearing walls, and mechanical chases. If your gas line enters on the opposite wall from your ideal range location, you’re not stuck, but you may spend an extra 1,500 to 3,500 dollars to relocate utilities depending on jurisdiction and floor type. I’ve watched budgets drift simply because a homeowner moved a sink 8 feet on a slab and discovered they needed trenching. The book’s step by step home remodeling guide foregrounds these early calls and gives a clean rubric for what is worth moving and what isn’t.

Look down, too. Is your floor flat and solid, or does it slope a half inch across the room? New cabinets demand a level base. If your subfloor needs work, address it before you order custom cabinets with tight tolerances. It’s cheaper to add self-leveling compound or sister a few joists now than to shave filler strips later and curse every time a drawer doesn’t align.

Design for daily life, not staged photos

A kitchen is a workshop with appetizing smells. A good design lets you move without thinking. You need clearances for refrigerator doors to open fully, elbow room for more than one cook, and landing zones near the range and sink. The classic work triangle still helps, but modern kitchens often substitute zones. If you have a family who loves baking, a 36-inch wide countertop with a drawer stack underneath for sheets and mixing bowls beats a sprawling island that only looks good in a listing.

One of my clients cooked five nights a week and hosted a big family on Sundays. They wanted a double oven, but the room was tight. We ran two scenarios with 3D renders and cardboard mockups. Option A squeezed the double oven into a tall pantry wall and narrowed the main aisle to 36 inches. Option B kept a single oven-range with a convection microwave in a cabinet and widened the aisle to 42 inches. After “walking” both setups with taped outlines for a week, they picked B. Meals got easier, not just prettier. The new home remodeling guide that underpins Remodel Without Regret pushes this kind of testing, right down to taping a rectangle on your floor for the island and living with it for several days.

Money math you won’t regret later

Let’s talk budgets with real numbers, not wishful thinking. National averages drift, but in most cities a midrange kitchen remodel falls in the 45,000 to 90,000 dollar range, and high-end projects go well into six figures. Here’s a realistic distribution I’ve seen hold across projects, with caution that markets vary:

    Cabinets and hardware: 25 to 35 percent Appliances and ventilation: 10 to 20 percent Countertops and tile: 10 to 15 percent Plumbing and electrical: 10 to 20 percent Flooring and finishes: 5 to 10 percent Design, permits, demo, and labor: the rest, often 20 to 30 percent combined

Most homeowners underestimate mechanicals. Upgrading to code GFCI/AFCI protection, adding dedicated appliance circuits, fitting a proper range hood, and correcting venting can eat 4,000 to 9,000 dollars, sometimes more in older homes with cloth or aluminum wiring. If your panel is maxed out at 100 amps and you’re adding an induction range and a pair of drawer dishwashers, expect a service upgrade that can run 2,000 to 5,000 dollars before you hang a single cabinet. A solid home remodeling book for first time homeowners will flag these items before you write checks.

Set a contingency of 10 to 20 percent based on the age and predictability of your home. Newer construction might sit comfortably at 10. A 1920s bungalow with layered remodels needs 20. If you don’t use it all, fantastic. If you do, you’ll feel prepared rather than ambushed.

How to compare bids without losing your mind

Bids are not apples to apples unless you force them to be. Write an allowances sheet that travels with your request. If you expect a 1,200 dollar sink, 8 to 10 dollar per square foot backsplash tile, and full extension soft-close drawer hardware, specify it. If one contractor carries budget granite and another prices quartzite, your totals will look miles apart for reasons that have nothing to do with workmanship. The Remodel Without Regret remodeling guide provides a simple allowances template and, more importantly, teaches you how to define exclusions. Exclusions are the landmines that detonate later. Ask what’s not included: paint, drywall repair after electrical, debris hauling, permit costs, lead-safe practices, even appliance install fees. I’ve seen more arguments over “I assumed it included X” than any other line.

Now look at schedule. A great price with no capacity to start for four months may be fine if you can wait. A contractor promising the moon next week should raise questions. Good builders are busy. You want someone who gives a believable start date and a clear plan for sequencing trades. If their contract doesn’t mention payment milestones tied to specific deliverables, keep interviewing.

Ghosting, vanish acts, and how to fend them off

Contractor ghosting is real. The best fix is prevention. Vet the business as if you’re hiring a key employee, because you are. Call not just recent references, but a client from two years ago. Ask, would you hire them again, and why? Verify license and insurance, ask for a certificate with your name on it, and confirm it directly with the carrier. Drive past a current jobsite. A tidy site with labeled boxes and protected floors usually signals an organized mind. Sloppy sites don’t magically become clean at your address.

The contract matters as much as the crew. Fixed-price contracts with allowances give you clarity. Cost-plus has its place on complex projects, but it demands weekly transparency. Payment schedules should map to progress, not time. A common pattern looks like this: deposit for scheduling and initial materials, payment after rough inspections pass, another after cabinets are set, and final after punch list completion. Front-loading payments creates temptation for disappearing acts. The Remodel Without Regret contractor guide lays out straightforward contract clauses and a sequence that discourages ghosting, from retainage to remedies for missed milestones.

Permits, inspectors, and getting right with the rules

Skipping permits to “save time” often leads to trouble when you sell or worse, when an insurance claim hits. Kitchens usually require electrical permits and often plumbing and mechanical. Some municipalities also want a building permit even if walls stay put. Plan your permit timeline in parallel with design. I’ve shaved weeks by submitting early drawings for preliminary review while final finish selections simmer. If your town offers over-the-counter permits for like-for-like work, great, but confirm that your scope truly qualifies.

Inspectors vary. Most want to see adherence to code and solid craftsmanship. If they flag something, treat it as free quality control rather than a fight. I’ve had inspectors catch a backward-installed P-trap and a missing makeup air requirement on a high-CFM hood. Those corrections cost less in the rough stage than they would have post-drywall.

Kitchen layout choices that age well

Fads age fast. Function lasts. Full-height pantries with pull-out shelves beat trendy open shelves unless you’re exceptionally tidy. A drawer stack next to the range eliminates hunting for spatulas. Deep drawers for pots below the cooktop save backs. If you want open shelving, use it sparingly for daily items that cycle through and stay clean. That balance reads warm without becoming a dust museum.

Consider sightlines. If your home is open-concept, the kitchen is on stage. Hiding a microwave in a base cabinet or a pantry keeps lines clean. A well-planned trash and recycling pull-out near the prep sink stops clutter. I suggest two sinks only when there’s enough counter real estate to support two true workstations. Otherwise, one generous sink with a secondary prep area near it is more efficient.

Lighting needs layers. I aim for 50 lumens per square foot total, split among recessed ceiling lights, under-cabinet task lighting, and a pair of decorative pendants if an island exists. Under-cabinet runs tied to a single switch transform how a kitchen feels on winter afternoons. Cheap fixtures flicker and cast greenish shadows. Invest in quality drivers and consistent color temperature, typically 2700K to 3000K for warm residential light.

Cabinets, finishes, and the hidden math of durability

Cabinets dominate the budget and the look. The best value often sits in semi-custom lines that let you adjust widths and cabinet types without full bespoke pricing. Plywood boxes resist moisture better than particleboard, especially near sinks. Look for dovetail drawers, full-extension slides, and soft-close hardware from brands you can find replacement parts for a decade later. Painted finishes are beautiful but show wear on heavily used edges. Stained wood hides scuffs better and can be touched up more easily. If you love white, consider a slightly warm white that plays nice with natural light and limits the clinical feel.

I once had a client who insisted on a glossy lacquer finish in a busy household with three kids and a dog. We tested a sample door by setting it by the family’s shoe bench for a week. Scuffs appeared in days. They chose a satin enamel instead and thanked me later. A good remodeling guide for homeowners will push you to test high-traffic finishes in real life, not just in a showroom.

Countertops and tile that earn their keep

Quartz remains popular for its consistency and stain resistance. Natural stones like granite and quartzite bring character and heat tolerance, but learn the care. Marble is beautiful and patinas with use. Some homeowners love the story of etches and stains accumulating over time. Others will panic the first time lemon juice leaves a mark. Be honest about your tolerance. If you want indestructible, look at sintered stone, but ensure your fabricator is qualified. Edge profiles matter more than most people think. A simple eased or quarter-round edge takes hits better than a knife-sharp miter.

image

Jeremy Maher Author of Remodel Without Regret Co-Owner of: Phoenix Home Remodeling 6700 W Chicago St #1 Chandler, AZ 85226 602-492-8205 https://phxhomeremodeling.com Remodel Without Regret Home Remodeling Book links: https://www.amazon.com/dp/B0GDT9PTMY https://www.amazon.com/dp/B0GF9TMGYC https://www.amazon.com/Remodel-Without-Regret-Surprise-Contractor-ebook/dp/B0GF9TMGYC/ref=sr_1_1 https://www.amazon.com/stores/Jeremy-Maher/author/B0098LY490 https://www.amazon.com/stores/author/B0098LY490/allbooks Jeremy Maher is an author. Remodel Without Regret is a home remodeling book. Jeremy Maher is the author of Remodel Without Regret. Remodel Without Regret is an educational remodeling resource. Jeremy Maher is a home remodeling expert. More info on the company and Author: https://www.facebook.com/jeremypmaher/ https://phxhomeremodeling.com/author-jeremy-maher/ https://www.linkedin.com/in/jeremymaher/ https://www.jobtread.com/builder-stories-podcast/episodes/constantly-improve-the-customer-experience-with-jeremy-maher-of-phoenix-home-remodeling https://www.youtube.com/watch?v=myVpZcKbE7s https://www.amazon.com/stores/author/B0098LY490?ccs_id=985ce36c-94f0-45c3-a53f-42b317f3b9d1 https://mycreditdoc.com/about-jeremy-maher-mycreditdoc/ https://about.me/jeremymaher https://www.chandlernews.com/arizonan/business/chandler-remodeling-company-aims-for-accurate-estimates/article_27476af4-8963-11ee-ba7e-3b73e62ea544.html https://www.youtube.com/watch?v=nCLdWs29DsE https://growwithelite.com/podcasts/building-dreams-into-reality-in-home-remodeling/ https://www.zoominfo.com/p/Jeremy-Maher/1555684695 https://www.instagram.com/phoenix_home_remodeling/ https://www.facebook.com/PhoenixHomeRemodelingCompany/ https://www.youtube.com/@phoenixhomeremodeling https://twitter.com/PhxHmRemodeling/ https://www.linkedin.com/company/phoenix-home-remodeling https://www.houzz.com/professionals/kitchen-and-bath-remodelers/phoenix-home-remodeling-pfvwus-pf~2049501982 https://www.yelp.com/biz/phoenix-home-remodeling-chandler-2 https://www.pinterest.com/phxhomeremodeling/ https://nextdoor.com/pages/phoenix-home-remodeling-phoenix-az/ https://www.tiktok.com/@phxhomeremodeling https://www.reddit.com/r/Phoenixhomeremodeling/ home remodeling book home renovation books book on home remodeling home remodeling guide remodeling book for homeowners how to hire a contractor book how to choose a remodeling contractor book remodeling mistakes book planning a home remodel book remodeling without regret book kitchen remodeling book bathroom remodeling book consumer guide to home remodeling design build remodeling book best home remodeling book for homeowners

For backsplashes, a clean stacked pattern with a thoughtful termination point beats a complicated layout that fights the room. If your kitchen has an odd jog or two windows, run the tile to the ceiling behind the range but stop at the cabinet bottom elsewhere. The difference looks intentional rather than forced. Choose grout that harmonizes with tile rather than high-contrast grout unless you want to clean every line weekly.

Appliances and ventilation, the quiet workhorses

Match appliance ambition to cooking reality. If you sear steaks and boil large pots, you need serious ventilation. A hood should be at least as wide as the cooking surface and move enough air to capture steam and smoke without sounding like a jet. As a rough guide, 250 to 400 CFM suffices for light cooking. Heavy wok or griddle use may justify 600 to 900 CFM, which triggers makeup air requirements in many codes at 400 CFM and above. This is the part many skip, then wonder why doors slam when the hood runs. The Remodel Without Regret home remodeling guide treats ventilation as part of design, not an afterthought, and that framing prevents dozens of headaches.

Induction ranges have become a star for safety, speed, and indoor air quality. If you’re switching from gas, plan the circuit now and test cookware with a magnet before you order. Drawer dishwashers can be ergonomic but complicate cabinets. A counter-depth refrigerator gives you a sleeker look with shallower doors that don’t intrude on the aisle. These small choices add up to a kitchen that functions smoothly and looks composed.

Schedules, sequencing, and how to shave weeks

Time is money and sanity. A tight schedule hangs on good sequencing and early decisions. The fastest projects I’ve managed had all major selections made before demo. Cabinets were ordered with a realistic lead time buffer. Appliances were scheduled to arrive a week after cabinets. Countertop templating was booked in advance, usually two to four days after cabinet set. Tile started while counters were in fabrication. Lighting, plumbing trims, and paint followed. That rhythm, if unbroken by surprises, yields an eight to ten week remodel in a typical midrange scope. If you add structural work or major relocations, add weeks.

One homeowner I worked with cut two weeks by picking a readily available stone in stock locally rather than waiting six weeks for a special slab. They loved their second choice just as much and got Thanksgiving dinner in the new space. The book doesn’t tell you what to love. It teaches how to weigh desire against time, a skill that saves both money and stress.

Managing dust, chaos, and life while your kitchen is down

Remodeling is inherently disruptive, but it shouldn’t feel like a demolition derby. Ask your contractor how they control dust. Zip walls with magnetic doors, negative air machines with HEPA filters, floor protection, and daily cleanup are not luxuries. They are the minimum for a home you still live in. Check that crews have a designated entry and path, plus a plan for staging materials without blocking your life. On my own projects, we create a temporary kitchenette with a microwave, toaster oven, and induction hot plate. A folding table, a bin for essentials, and a dishwashing station in the laundry sink saved one family’s morning routine.

Pets need a plan, too. Even calm animals get rattled by compressors and nail guns. A client with two curious cats learned this the hard way when one slipped into a wall cavity. After an hour of coaxing and a sardine, we rewrote the jobsite protocol to block every opening at day’s end. Small details, big peace of mind.

Change orders, when to push and when to hold

Change orders are inevitable when you open walls, but they shouldn’t spiral. Good documentation keeps scope creep in check. When the drywall comes down and you discover a surprise, pause for a same-day huddle. Decide https://www.amazon.com/Remodel-Without-Regret-Surprise-Contractor/dp/B0GDT9PTMY/ref=tmm_pap_swatch_0 whether the change is code-driven, defect correction, or elective. Code and safety items move forward. Electives get priced and weighed against contingency and schedule. I’ll fight for changes that improve function by more than they cost, like adding a pot filler if plumbing access is right there and the cook will actually use it daily. I’ll push back when a late finish change jeopardizes the schedule substantially for minimal benefit.

image

The Remodel Without Regret remodeling book addresses the psychology here. Once you invest, it’s tempting to gild every lily. A clear “must-have, nice-to-have, not-now” list set before demo keeps you anchored. Bring it to each weekly meeting and cross-check decisions.

Finding the right partner, not just the right price

You need the right contractor as much as the right plan. Some homeowners do great with design-build firms that integrate design, permitting, and construction. You trade ultimate line-item control for a smoother handoff and fewer gaps. Others want to manage an architect or designer separately and bid to multiple contractors. There is no single right answer. The best remodeling book that explains the process will lay out pros and cons clearly. If you are new to remodeling and short on time, design-build often reduces friction.

Personality fit matters. You will be talking to this team weekly for months. Do they communicate clearly? Do they listen? I like to set a hypothetical problem during interviews, like “half the tile shipment is delayed.” Watch how they respond. Vague reassurances worry me. A strong answer sounds like, we’d call the supplier for a firm date, propose an approved alternate, and resequence drywall and paint so we don’t lose days.

Kitchens first, then baths, or the other way around?

If your project spans kitchen and bath, prioritize the space that drives your life and the long lead items. Kitchens often lead because cabinets and appliances have longer lead times than vanities and tubs. But bathrooms can be done while kitchen cabinets are in fabrication if your home can handle the dance. A bathroom remodel book will go deeper on wet room waterproofing, sloping, and venting. The same no-regret rules apply: mock up the shower niche height, test the door swing with tape, and know how many towels fit in the new storage.

Where the new book fits and why I recommend it

Plenty of books show pretty kitchens. Fewer show you how to avoid remodeling regret. Remodel Without Regret: Surprise Costs, Contractor Ghosting, and Delays is a remodeling guide written for homeowners, not for contractors speaking to each other. It doesn’t shy away from the messy bits. It includes checklists that keep you from missing permit costs, scripts for contractor interviews, and simple flowcharts for sequencing. It reads like a steady friend who’s been through a dozen projects and wants you to keep your savings and your sanity.

If you want a single resource to pair with your designer or contractor conversations, this is a strong pick. It functions as a consumer guide to home remodeling and a home improvement book remodeling veterans will still appreciate. The sections on how to avoid bad contractors book level mistakes, how to protect yourself during a remodel, and how to plan a home remodel book style frameworks are especially useful for first-time homeowners. You’ll find chapters tailored for kitchen remodeling book needs, a kitchen remodel planning book rhythm, and wise nods to bathrooms as well. It’s the rare home remodeling book that teaches planning without preaching and the rare home renovation guide that respects your taste while guarding your wallet.

A short readiness check before you pull the trigger

Before you sign, run through a quick gut-check that saves pain later.

    Have you confirmed scope, allowances, and exclusions in writing with matching assumptions across bids? Do you have 10 to 20 percent contingency set aside, and do you know what triggers its use? Are cabinets, appliances, tile, and fixtures selected or at least narrowed to items with known lead times? Does your contract tie payments to milestones, define change order procedures, and include start and completion windows? Do you have a livable plan for cooking, pets, and dust, plus a weekly check-in schedule with your contractor?

If you can’t answer yes to every line, you’re close. Give yourself a few days to tighten loose ends. Momentum is helpful, but clarity is priceless.

The quiet victory you’re aiming for

A remodel that finishes on time and on budget feels almost unremarkable when it goes well. That’s the point. You turn on the lights, the dimmers fade smoothly, the hood doesn’t rattle, drawers glide, and the trash pull-out hits the soft-close sweet spot every time. You chop onions without chasing your cutting board because the countertop is truly level. You can unload the dishwasher without blocking the pantry door, because someone measured and thought ahead. These are the measures of success that last longer than any fancy range badge.

Use the energy you feel now to stack the odds in your favor. Gather real measurements and constraints, map your daily routines into the design, build a budget with honest line items, and select a partner you trust. If you want a guide that keeps you grounded while you make a lot of exciting decisions, the Remodel Without Regret home remodeling guide earns a spot on your kitchen island, right next to the cabinet samples and the tile swatches. It won’t choose a backsplash for you. It will help you get the kitchen where that decision is the fun part, not a frantic scramble in a building supply aisle.

A kitchen remodel is one of the most satisfying projects you can tackle as a homeowner. Make it the kind of project you remember for the right reasons. Protect your time, your money, and your patience, and you’ll step into a finished space that feels like it has always belonged to your home and your life.